常見問題
question
企業案例
case
聯系我們
- 聯系人:濟南燕翔鐵藝制品有限公司
- 手機:15953126901
- 電話:18615254757
- 郵箱:785385551@qq.com
- 地址:濟南市天橋區歷山北路黃臺不銹鋼市場3區317
鐵藝護欄常規的安裝方式分為什么?
來源://4216.com.cn 日期:2022-05-25 發布人: 瀏覽次數:8次
鐵藝護欄在廠家制作完成后,還要經過裝卸運輸過程到工地,然后再進行安裝。
After the iron guardrail is manufactured by the manufacturer, it needs to go through the process of loading, unloading, and transportation to the construction site before installation.
運輸裝卸:濟南鐵藝護欄出廠之前要做好包裝,起碼要把護欄的高點包裝一下,如:護欄的立柱以及大的橫管,中間的小管因為比大管矮,一般情況下磨不著,所以不用包裝。
Transportation and loading and unloading: Firstly, before leaving the factory, Jinan Iron Art Guardrail should be well packaged. At least, the high points of the guardrail should be packaged, such as the columns of the guardrail and the large horizontal pipes. The small pipes in the middle cannot be ground because they are shorter than the large pipes, so packaging is not necessary.
如果一點都不包裝的話,裝卸過程以及運輸過程很容易磨損,還要安裝過程再磨損漆面的話,安裝完之后漆面就非常難看了,工程的話很可能驗收不過,切記包裝很關鍵,俗話說貨賣一張皮,就算不包裝也沒問題的話,包裝一下也能提高產品的檔次。
If there is no packaging at all, the loading and unloading process and transportation process are prone to wear and tear. If the paint surface needs to be worn during the installation process, it will be very unsightly after installation. If the project is not accepted, remember that packaging is crucial. As the saying goes, selling a piece of leather is not a problem, and packaging can also improve the quality of the product.
然后再就是安裝,確定好安裝方式,常規的安裝方式分為:
Then there is the installation, determining the installation method. The conventional installation methods are divided into:
1:法蘭盤固定也就是打膨脹螺栓固定,這種方式需要的工具有:沖擊電錘、膨脹螺栓、鐵錘、扳手、螺絲刀、卷尺等等,需要注意水泥地面平整度,緊膨脹螺栓的時候注意調整立柱的垂直度。
1: Fixing the flange plate is also known as fixing with expansion bolts. This method requires tools such as impact hammers, expansion bolts, hammers, wrenches, screwdrivers, tape measures, etc. It is necessary to pay attention to the flatness of the cement floor and adjust the verticality of the column when tightening the expansion bolts.
2:加長腿預埋也就是立柱挖坑澆筑,這種方式需要的工具有:水泥、沙子、石子等攪拌工具,小推車等運輸工具。需要注意在澆筑混泥土時候好用石頭或者磚塊先把立柱固定住然后再澆灌混凝土,只用混凝土剛開始容易移動位置。
2: Long leg pre embedding, also known as column excavation and pouring, requires tools such as mixing tools such as cement, sand, and stones, as well as transportation tools such as small carts. It should be noted that when pouring concrete, it is better to use stones or bricks to fix the column first and then pour concrete, only using the position where the concrete is easy to move at the beginning.
3:下預埋鐵焊接固定,這種方式需要提前下裝預埋鐵,安裝的時候立柱或者橫管直接焊接到預埋貼上,這樣要要求預埋鐵的尺寸和護欄的尺寸要高度一致,這種安裝速度是快的,不過這種安裝方式多少的會破壞漆面,需要把破壞的漆面打磨再上漆。
3: The lower embedded iron is welded and fixed. This method requires the installation of the embedded iron in advance. During installation, the column or horizontal pipe is directly welded to the embedded adhesive. This requires the size of the embedded iron and the size of the guardrail to be consistent in height. This installation speed is fast, but this installation method can damage the paint surface to some extent, and the damaged paint surface needs to be polished before painting.
這幾種安裝方式各有各的好處,根據實際情況來選擇。注意調整好護欄的整體高度一致以及安裝好的護欄在一條線上。更多相關內容就來我們網站//4216.com.cn咨詢了解吧!
These installation methods each have their own advantages, and should be chosen according to the actual situation. Pay attention to adjusting the overall height of the guardrail to be consistent and the installed guardrail to be in line. For more related content, come to our website //4216.com.cn Consult and understand!
下一篇:鐵藝大門的優勢與安裝前的準備工作 上一篇:為什么說輕型鋼結構房屋比較結實?